Red Seal Carpenter Complete Practice Exam 2025

Question: 1 / 400

How is truss roof sheeting installed?

Install ridge blocking, all permanent bracing and remove temporary bracing.

Remove all temporary bracing and sheet roof.

Install ridge blocking, sheet roof and remove temporary bracing as it gets in the way of the sheeting then install the permanent bracing.

Install ridge blocking and permanent bracing then remove temporary bracing as it gets in the way of the roof sheeting.

In the installation of truss roof sheeting, it is crucial to ensure structural integrity and safety throughout the process. The correct choice emphasizes the necessity of installing ridge blocking and permanent bracing before commencing with the roof sheeting. Ridge blocking provides a solid surface for securing the sheeting and contributes to the overall strength of the roof system.

By installing permanent bracing first, the trusses gain added support, helping them maintain their shape during the sheeting process. This step is vital as trusses can be susceptible to movement or deformation when not adequately braced. As the sheeting is laid, if temporary bracing interferes with the process, it is acceptable to remove it at that time. This approach balances safety and efficiency, ensuring that structural supports are in place while still allowing for flexibility during installation.

Overall, this systematic method not only reinforces the roof before adding sheeting but also accommodates the operational needs during installation, ensuring that the work is done safely and effectively.